Chart view

A chart view draws one chart from the items the view’s filters allow.

  1. Open Layout in the toolbar.
  2. Pick a Chart type.
  3. Under Data, pick what to measure and a Field.
  4. Pick the field whose values become the categories.
  5. Set Sort and Show top.
  1. Select Add measure. A bar, line or area chart holds up to three.
  2. Set the measure’s Field and Name.
  3. On a vertical chart, set Draw as to Bar or Line.

Remove Break down by first, because a chart cannot hold a breakdown and several measures.

Break down by splits each bar into segments. On a bar or area chart with one measure, Stacking then sets how the segments are drawn. On a date axis, Group dates by picks days, weeks, months, quarters or years.

A duration on the axis groups into ranges, and a number can too, under Group numbers by. Ranges draw a histogram. The field pickers also list History fields, such as Time in Status and Cycle time.

Scatter places one point per item. Flow over time follows items day by day, as a cumulative flow, a burnup or a burndown. Both have their own settings under Data, described in How cycle time and flow charts work.

Click a bar or a slice. One item opens in its detail drawer, and several items open in a list.