Schedule view

A schedule view lays items out on a time axis, split into lanes. Each lane is one value of the field the view groups by. Any field can group the view.

Each bar is one item, drawn from its start date to its end date.

Drag a bar to another lane, and the item takes that lane’s value in the grouping field. While you drag, the lane the bar will land in is tinted, and the tooltip beside the pointer names it.

Some lanes cannot take the item, for example when you cannot edit the grouping field. The tooltip then says why, and releasing there changes only the dates. Esc cancels the drag.

The table beside the bars takes the same columns as a list view. List view explains how to choose them and how to add a field from the column list.

The table beside the bars totals its columns in each lane, each section and the total row. Open a column’s header menu and pick a function under Total. List view lists the functions each column offers.

  • An item counts once in each lane it sits in, and once in a section or the total row.
  • An item counts with the figure its row shows, which is usually its own value. A value a parent passes down to an item is not counted on it.
  • When the view shows only some types, a row can show a figure calculated from the items below it: a number, date or formula with no value of its own, and tracked time, which always adds the time logged below it. How values roll up to a parent explains both. The total counts that figure. An item below that row in the same lane, section or total row counts through it, so no value is counted twice. An item that shows its own value does not pass on the values below it, so those items count on their own, even when it is not in the view. Any function other than the column’s default reads every row, and Count counts every row that shows a value.

When the view is grouped by a people field and has an estimate field, it adds workload:

  • an hour strip for each column
  • a total for each lane
  • a red tint when the hours in a column exceed the lane’s capacity. A team lane’s capacity is the sum of its members’.

A new schedule view starts grouped by Assignee, when that field applies to the types the view shows, and takes the estimate from the field your organization mapped as its default, if it mapped one. With both in place a new view shows workload without any setup. Clear Group by, or group by any other field, and the view is a plain grouped schedule.

A deleted user gets no lane. An item whose only person in the grouping field is a deleted user goes to the Unassigned lane.

An item with no estimate still has a bar. That bar has no hours.

When the last Group by level is a people field, Layout shows Group lanes. The choice appears only when at least one person belongs to a team. Group lanes has these choices:

  • No grouping: one lane for each value of the field.
  • By team: person lanes sit under a section for each team. It needs a single Group by level.
  • Teams (roll-up): one lane for each team. A team lane holds the work assigned to the team and the work assigned to any of its members, and its capacity is the capacity of its members added together.

With two Group by levels, each section of the first level gets its own team lanes. A person who belongs to no team is shown in a No team lane with Teams (roll-up), and in a No team section with By team.

Team roll-up lanes have three limits:

  • You cannot set hours on a roll-up lane. When you may set hours elsewhere, the bar’s right-click menu says Turn off the team roll-up to set hours.
  • A team lane also shows the reservations of the team’s members. You cannot change a member’s reservation there. Click it to read which lane it is on.
  • Dragging a bar to another team lane replaces the source team with the target team in the item’s people field. If the item names a member of the source team instead of the team, only the dates change. Dropping on the No team lane changes only the dates. If the people field does not accept teams, or does not offer the target team, the bar stays in its lane and only the dates change.

How roll-up lanes count hours is in How hour allocation works.

Hold Shift and drag across a person’s lane row, or across the row of reservations under it. When you release, choose one:

  • Reserve time (1) holds the person’s time for work that is not a task.
  • Time off (2) books days off.

When you may do only one of the two, Teamhood skips the choice.

To book a single day, right-click an empty spot in the person’s lane and choose from the same menu. Zoomed out to Month or wider, a right-click books the whole week instead. The menu appears even when you may do only one of the two.

Then type a name in the card under the dates. Press Enter to save, or Esc to save nothing.

For a reservation, also set its hours per day, which starts at half the person’s working day. Tab moves between the two fields. Time off always takes the whole day.

A team lane offers only Reserve time.

Change or remove a reservation or time off

Section titled “Change or remove a reservation or time off”

Click a reservation, or a purple day of a person’s time off. A card opens under it.

  • On a reservation, change the name, the hours per day, or the From and To dates, or tick Tentative.
  • On time off, change the reason, or the From and To dates.
  • Remove deletes the reservation or the time off without asking. Ctrl-Z brings it back.

Press Enter, choose Save or click outside the card to save. A card you did not change saves nothing.

New dates need at least one working day. A reservation keeps its hours per day on the new working days.

A reservation that books a fixed total, or different hours on different days, has no hours per day to edit. Renaming it never changes its hours. New dates spread a fixed total over the new working days.

A right-click offers the same actions in a menu. On a day that is already time off, the menu offers Edit time off and Remove time off in place of Time off.

The same click opens the card for everyone. When you may not change the reservation or the time off, the card shows what it is and says who can change it. In what-if mode, time off opens this way. How what-if planning works explains the mode.

Click a purple day that is an organization holiday or a team closure to read what it is and its dates. A team closure opens from the person’s own lane row. Nobody changes either one on the schedule. When you may change holidays, the holiday’s card has a link, Open holiday settings.

In Layout, choose a field in Color by. Bars color by type, by a select field or by a people field.