Schedule view
What a lane and a bar are
Section titled “What a lane and a bar are”A schedule view lays items out on a time axis, split into lanes. Each lane is one value of the field the view groups by. Any field can group the view.
Each bar is one item, drawn from its start date to its end date.
Drag a bar to another lane, and the item takes that lane’s value in the grouping field. While you drag, the lane the bar will land in is tinted, and the tooltip beside the pointer names it.
Some lanes cannot take the item, for example when you cannot edit the grouping field. The tooltip then says why, and releasing there changes only the dates. Esc cancels the drag.
Total a column
Section titled “Total a column”The table beside the bars takes the same columns as a list view. List view explains how to choose them and how to add a field from the column list.
The table beside the bars totals its columns in each lane, each section and the total row. Open a column’s header menu and pick a function under Total. List view lists the functions each column offers.
- An item counts once in each lane it sits in, and once in a section or the total row.
- An item counts with the figure its row shows, which is usually its own value. A value a parent passes down to an item is not counted on it.
- When the view shows only some types, a row can show a figure calculated from the items below it: a number, date or formula with no value of its own, and tracked time, which always adds the time logged below it. How values roll up to a parent explains both. The total counts that figure. An item below that row in the same lane, section or total row counts through it, so no value is counted twice. An item that shows its own value does not pass on the values below it, so those items count on their own, even when it is not in the view. Any function other than the column’s default reads every row, and Count counts every row that shows a value.
Workload when the lanes are people
Section titled “Workload when the lanes are people”Group the view by a people field and map an estimate field, and the view adds workload:
- an hour strip for each column
- a total for each lane
- a red tint when the hours in a column exceed the lane’s capacity. A team lane’s capacity is the sum of its members’.
Group by any other field, or map no estimate, and the view is a plain grouped schedule.
A deleted user gets no lane. An item whose only person in the grouping field is a deleted user goes to the Unassigned lane.
An item with no estimate still has a bar. That bar has no hours.
Group lanes by team
Section titled “Group lanes by team”When the last Group by level is a people field, Layout shows Group lanes. The choice appears only when at least one person belongs to a team. Group lanes has these choices:
- No grouping: one lane for each value of the field.
- By team: person lanes sit under a section for each team. It needs a single Group by level.
- Teams (roll-up): one lane for each team. A team lane holds the work assigned to the team and the work assigned to any of its members, and its capacity is the capacity of its members added together.
With two Group by levels, each section of the first level gets its own team lanes. A person who belongs to no team is shown in a No team lane with Teams (roll-up), and in a No team section with By team.
Team roll-up lanes have two limits:
- You cannot type hours into cells or shape bars on a roll-up lane. When you may shape hours, the bar’s right-click menu says Turn off the team roll-up to shape hours.
- Dragging a bar to another team lane replaces the source team with the target team in the item’s people field. If the item names a member of the source team instead of the team, only the dates change. Dropping on the No team lane changes only the dates. If the people field does not accept teams, or does not offer the target team, the bar stays in its lane and only the dates change.
How roll-up lanes count hours is in How hour allocation works.
Reserve time or book time off
Section titled “Reserve time or book time off”Hold Shift and drag across a person’s lane row, or across the row of reservations under it. When you release, choose one:
- Reserve time (
1) holds the person’s time for work that is not a task. - Time off (
2) books full days off.
When you may do only one of the two, Teamhood skips the choice.
To book a single day, right-click an empty spot in the person’s lane and choose from the same menu. Zoomed out to Month or wider, a right-click books the whole week instead. The menu appears even when you may do only one of the two.
Then type a name in the card under the dates. For a reservation, also set its hours per day, which starts at half the person’s working day. Tab moves between the two fields. Press Enter to save, or Esc to save nothing.
To change a reservation later, right-click it and choose Edit name and hours. A reservation that books a fixed total, or different hours on different days, shows its name only, so editing it never changes its hours.
A team lane offers only Reserve time.